Olympic High School Addition & Modernization

Restoring Pride to Campus

An outdated 70’s era high school is given new life as a sustainable, light‐filled, inspiring learning environment.

Silverdale, Washington’s Olympic High School was originally constructed in 1977 as an unappealing
series of low‐slung, dark, functional boxes. Principal Rebecca Johnson explains that the well‐worn
facility simply no longer measures up to the aspirations of its students and dedicated staff, imagining
instead a place where students can “stand up straight” and be proud of themselves and their school.

The school district hired SKL to give Olympic a new 96,000 SF centerpiece, which includes a prominent
new Entry, Classrooms, Technical Labs, and a 450 seat performing arts Theatre. Central to the scheme is
a two story light‐filled Commons where students and faculty can congregate, meet, eat, and interact.
According to Gladys Ly‐Au Young, who tested the design using daylighting models, “Many people do not realize the importance of daylight to their wellbeing, and the importance of well tuned daylight in the places they live, work, and learn. In this case, we incorporated north facing light monitors, combined with glass faces at each end, one opening towards the Olympic mountains, the school’s namesake.”

The addition is designed with sustainable principles in mind. According to predictive energy modeling,
the school will use 70% less energy than code allows, and had received a $112,000 conservation grant
from Puget Sound Energy as a result. An existing drainage ditch in front of the school that feeds into Stampede Creek will be reinvigorated with biologically restorative plants, and traversed with a new footbridge as a highlight of coming to school.

Given the complexity of weaving new programs into an existing school, numerous workshops were held
with the school community, which included “playing with blocks”, or moving spaces around on a scale
model in order to achieve a user‐friendly floor plan. Construction is now underway, and is carefully
managed via a GCCM process with Korsmo Construction to allow school to remain in session while its
new center is built. The school is anticipated to open in the fall of 2019.

Location   Silverdale, WA
Status   Expected Fall 2019
Team   Gladys Ly-Au Young, Rick Sundberg, John Kennedy, Wing-yee Leung, Jeremy Imhoff, Nicole Lew
Size   95,000 SF new construction (150,000 SF existing facility)
Press + Recognition   

Puget Sound Energy Conservation Grant


Features   

Classrooms, CTE labs, Central entry commons, Performing Arts Center, Library, Administrative offices